How we work

How to move AI from pilot to production under your governance.

We measure first, pass your gate, close every finding, and hand it over.

Think of it like hiring a contractor

You would not let a contractor swing hammers before you both agreed on what "done" looks like, right? Same thing here. Four steps. Nothing fancy.

The four steps

  1. 1
    Baseline

    Step 1: measure first

    Before we touch anything, we measure how it works today, in your numbers. Hours per status report. Days per estimate. How many engineers actually use the tool you already bought. Right order of magnitude, not precision.

    No baseline means nobody can ever prove it worked, and "can you show me the data" ends the conversation.

  2. 2
    Gate

    Step 2: pass your gate

    Two things. We walk it through your governance the right way: pre-briefs, the right classification, "assistant, not executor." And the checks run inside your pipeline, where your team can watch them.

    If a change cannot pass your gate, it does not ship, and no amount of AI enthusiasm changes that.

  3. 3
    Review loop

    Step 3: close every finding

    Separate AI reviewers check the work, each starting fresh and never the agent that wrote it. Findings get fixed and it is reviewed again, until there are zero open P0 and P1 bugs (critical and high severity). Not "pretty good." Zero.

    This is the step most teams skip, and it is the one that separates a demo from something your team runs every day.

  4. 4
    Handover (the exit)

    Step 4: hand it over

    From day one we train your people to run the work without us. By the time we leave, your team owns it.

The step to check us on

Step 2. Anyone can say "approved." Ask us to show you the check running in your pipeline. If we cannot, we have not done step 2.

Ask to see it on a scoping call ->
pull request / checksillustration
buildpass
testspass
your-governance-gatepass
review: open P0/P1 = 0pass

What this is not

  • Not a proof of concept.
  • Not a deck.
  • Not training slides.
  • Not a tool license.
  • Not a dependency on us.

Why green

Green is the only status that matters. Not a demo, not a pilot, not a slide.

Every AI project in your building is red, yellow, or green, and most are stuck at yellow forever. We get yours to green, in your numbers, through your gate, with every finding closed, and then we leave it with your team.

redyellowgreen

Questions

How do you move an AI pilot to production in a regulated company?

In four steps. We measure how the work happens today, in your numbers. We go through your governance the right way, with the checks running inside your pipeline. Separate AI reviewers, never the agent that wrote the work, review it until there are zero open P0 and P1 bugs. And from day one we train your people to run the work without us.

What checks run in our pipeline, and can we watch them?

The checks run inside your pipeline, where your team can watch them. If a change cannot pass your gate, it does not ship.

What does "zero open P0 and P1" mean?

P0 and P1 are critical and high severity bugs. Separate AI reviewers check the work, each starting fresh and never the agent that wrote it. Findings get fixed and it is reviewed again, until none are open. Not "pretty good." Zero.

What do you measure before starting, and why?

How the work happens today, in your numbers: hours per status report, days per estimate, how many engineers actually use the tool you already bought. Right order of magnitude, not precision. No baseline means nobody can ever prove it worked.

Next step

Book a 30-minute scoping call. If it is a fit, the first four hours of scoping are free.